فارسی
Contact Us
Sign in
Remember me
Create Account
Reset Password
Menu
Theses list
Sort table by clicking on the column header
Row
Code
Title
Year
Code
Field
XML
View
5026
21129
Evaluation of mechanical properties of concrete containing checkneh and zeolite pozzolans and nanoparticle with the aim of sustainable development and cost management
0
khu-cv-ths-340-60573
13 Time(s)
5027
21130
Multi-Mode Multi-Resource Constrained Construction Project Scheduling and Considering Uncertainty in the Duration of Activities by Metaheuristic Algorithm (Case Study)
0
khu-cv-ths-340-60575
14 Time(s)
5028
21131
Identification and qualitative analysis of sources of risk affecting the time of pipeline and refinery projects (Case study: Iran Petroleum Industry)
0
khu-cv-ths-340-60578
14 Time(s)
5029
21132
Propose a model for evaluation project management information system success based on the delon and mclean model
0
khu-cv-ths-340-60579
12 Time(s)
5030
21133
Risk Management of Design and Build Dam Projects Using Fuzzy Multi-Criteria Decision Making (Case study of Gelevard Dam)
0
khu-cv-ths-340-60580
13 Time(s)
5031
21134
Investigating the relationship between occupations and construction hazard using structural equations
0
khu-cv-ths-340-60581
12 Time(s)
5032
21135
Providing a model for reducing the risk of educational construction projects based on the use of integrated project delivery method(IPD)
0
khu-cv-ths-340-60582
12 Time(s)
5033
21136
Estimating cost of high-rise residential steel building construction in pre-design stage using artificial neural networks
0
khu-cv-ths-340-60583
16 Time(s)
5034
21137
Identifying the risks of building large sports stadiums projects
0
khu-cv-ths-340-60584
13 Time(s)
5035
21138
Investigating Innovation Approaches in the Construction Industry and Providing a Comprehensive Model for Realizing Different Types of Innovation in Construction Projects
0
khu-cv-ths-340-60585
12 Time(s)
5036
21139
Identifying and Assessing Supply Chain Risks in concrete dams
0
khu-cv-ths-340-60586
12 Time(s)
5037
21140
The role of risk assessment for the oil and gas tanks on the success of refinery projects
0
khu-cv-ths-340-60590
12 Time(s)
5038
21141
Identification of value engineering’s risk sources in Iran's construction projects
0
khu-cv-ths-340-60592
12 Time(s)
5039
21142
organizational performance mediated by creativity in the construction industryThe relationship between organizational intelligence and
0
khu-cv-ths-340-60593
13 Time(s)
5040
21143
Robust optimization of earthworking in roadway project
0
khu-cv-ths-340-60594
12 Time(s)
5041
21144
A Comparative Study of Project Life Cycle with Organization Life Cycle Theory by Ichak Adizes
0
khu-cv-ths-340-60596
12 Time(s)
5042
21145
Factors Affecting the Adoption of the Precast Elements in Concrete Buildings Based on Technology Acceptance Model (TAM) and Technology, Organization and Environment Framework (TOE)
0
khu-cv-ths-340-60597
12 Time(s)
5043
21146
Investigating Factors Affecting Organizational Performance of Contracting and Consulting Companies in the Construction Industry
0
khu-cv-ths-340-60598
12 Time(s)
5044
21147
Developing cash flow model of construction projects based on additional financing strategies from the contractor's point of view using System dynamics (SD) approach
0
khu-cv-ths-340-60606
12 Time(s)
5045
21148
Provide a model of performance coaching in the Construction industry based on the attitude of Tony Llewellyn
0
khu-cv-ths-340-60609
13 Time(s)
5046
21175
Calculation of surface deformation of Taftan volcano using Sentinel 1 images interferometry and GPS observations
0
khu-cv-ths-181-60668
12 Time(s)
5047
21177
Comparison the effect of neck stabilization exercises with and without thoracic mobility exercises on neck pain, range of motion, muscle endurance, proprioception and posture in women with chronic neck pain and forward head posture
0
khu-cv-ths-8231-60719
9 Time(s)
5048
21180
Relationship between Media Consumption and Lifestyle Type among Tehran Residents
0
khu-cv-ths-468-60846
12 Time(s)
5049
21182
oprational risk modeling using machine learninig algorithms (Case study of the banking industy)
0
khu-cv-ths-2830-60849
13 Time(s)
5050
21183
Effects of channel width on local scour hole due to wall jets(concerning the densimetric Froud number)
0
khu-cv-ths-279-60867
13 Time(s)
Page
202
from
377
First
Previous
1
2
3
...
201
202
203
...
375
376
377
Next
Last